User:aprilrdlk179130
Jump to navigation
Jump to search
it can be computed as the full time from when the failure happened to when operation was totally restored. Rig stand-by time is routinely regarded as optimistic NPT (fig. six). In this piece, I look
https://omg-directory.com/listings12819824/drill-time-investments-can-be-fun-for-anyone